|
SUMMARY |
| PROJECT |
YEAR |
FUNDINGx1000's |
PHASE |
TYPE |
| Aqui Esta from Coronado Dr to
US 41 |
2 |
868 |
ADM |
Road |
| Aqui Esta from Bal Harbor to
Vasco |
2 |
1012 |
PE |
Road |
| Aqui Esta from Vasco to US 41 |
3 |
506 |
PE |
Road |
|
Bayshore Road from Edgewater to US 41 |
3 |
80 |
CST |
Sidewalk |
| Burnt Store Rd from Notre Dame
to 1Mi S |
3 |
500 |
CST |
Shoulders |
| Cape Haze Pioneer Trail Phase
VII |
4 |
97 |
CST |
Bike Path |
| Cape Haze Pioneer Trail Phase
VI |
1 |
300 |
CST |
Sidewalk |
| Cape Haze Pioneer Trail from
Coral Creek to Placida |
2 |
300 |
CST |
Bike Path |
| Computer System traffic control |
1 |
5122 |
CST |
Signal |
| TSM Box traffic Ops improvement |
3 |
100 |
CST |
Road |
|
CR 765A (Burnt Store Rd,) |
1 |
107 |
CST |
Sidewalk |
| CR 765A Bridge
replacement #010005 |
4 |
885 |
CST |
Bridge |
| Englewood Interstate connector |
1 |
1 |
PE |
Road |
| Forrest Nelson from Quesada to
Bachman |
1 |
201 |
CST |
Sidewalk |
| Gulf Course from Fairway to
Knollwood |
2 |
50 |
CST |
Sidewalk |
| I-75 at Br #010059 & 010060 |
1 |
2458 |
CST |
Bridge |
| I-75
Full Deck Panel |
1 |
2059 |
DSB |
Bridge |
| I-75 @ Peace River Br |
1 |
1575 |
INC |
Road |
| I-75 from Lee CO/L to US 17 |
2 |
9767 |
CST |
Resurface |
| Jones Loop Rd at Piper Rd and
I-75 S ramp |
2 |
300 |
CST |
Signals |
| Murdock Area sidewalks |
3 |
300 |
CST |
Sidewalks |
| Piper Rd Corridor from
I-75/Jones Loop Rd to CR 74 |
3 |
500 |
CAP |
Road |
| Piper Rd Corridor Improvements
Phase I |
3 |
750 |
CAP |
Road |
| Piper Rd Corridor Improvements
Phase II |
4 |
500 |
CAP |
Road |
|
Punta Gorda Traffic Signals Reimbursement |
1 |
15 |
OPS |
Signals |
| SR 31 from Lee CO/L to CR 74 |
2 |
4631 |
CST |
Resurface |
| SR 31 from CR 74 to DeSoto CO/L |
2 |
2394 |
CST |
Resurface |
| Toledo Blade from US 41 to
Pellam |
2 |
928 |
PDE |
Road |
| Toledo Blade from US 41 to
Pellam |
4 |
1518 |
PE |
Road |
| Trabue Harbor Walk Laishley to
Phase I |
1 |
225 |
CST |
Bike Path |
| Traffic Signals |
1 |
32 |
OPS |
Signals |
| US 17 from CR 764 S to CR 764 N |
3 |
377 |
CST |
Landscape |
| US 17 from CR 764 S to DeSoto
CO/L |
2 |
10385 |
ADM |
Road |
| US 17 NB (Olympia)
from US 41 to Cochran |
3 |
418 |
CST |
Drainage |
| US 17 NB (Olympia)
from US 41 to Cooper |
1 |
80 |
PE |
Resurface |
| US 41 from N of SR 776 to
Sarasota CO/L |
1 |
2883 |
CST |
Resurface |
| US 41 from Lee CO/L
to S of Morningside |
2 |
4053 |
CST |
Resurface |
| US 41 from S of Morningside to
St Francis Rd |
2 |
1515 |
CST |
Resurface |
|
US 41 from Peace River to Bayshore |
3 |
80 |
CST |
Sidewalk |
|
US 41 from N of Peace River Br to SR 776 |
5 |
750 |
PDE |
Road |
|
US 41 from Bayshore Rd to Tarpon Blvd |
4 |
470 |
CST |
Sidewalk |
| US 41 North at Taylor |
2 |
75 |
CST |
Landscape |
| US 41 South at Gilchrist Br |
2 |
125 |
CST |
Landscape |
|
US 41 S from Carmelita to Marion |
5 |
400 |
CST |
Landscape |
| US 41 from Aqui Esta to
Carmalita St |
1 |
200 |
CST |
Landscape |
| US 41 from Carmalita to Peace
River Br |
2 |
200 |
CST |
Landscape |

YEAR, Refers to
the year the project is at. i.e. (2nd year of a 3 year project)
ADM - Administration,
PDE - Project Development and Environment, PE - Preliminary
Engineering, CST - Construction.
OPS - Operations
Grant, CAP - Capital Grant, DSB - Design Build,
INC - Incentive