SUMMARY

PROJECT YEAR FUNDINGx1000's PHASE TYPE
Aqui Esta from Coronado Dr to US 41

2

868 ADM Road
Aqui Esta from Bal Harbor to Vasco 2 1012 PE Road
Aqui Esta from Vasco to US 41 3 506 PE Road
Bayshore Road from Edgewater to US 41 3 80 CST Sidewalk
Burnt Store Rd from Notre Dame to 1Mi S 3 500 CST Shoulders
Cape Haze Pioneer Trail Phase VII 4 97 CST Bike Path
Cape Haze Pioneer Trail Phase VI 1 300 CST Sidewalk
Cape Haze Pioneer Trail from Coral Creek to Placida 2 300 CST Bike Path
Computer System traffic control 1 5122 CST Signal
TSM Box traffic Ops improvement 3 100 CST Road
CR 765A (Burnt Store Rd,) 1 107 CST Sidewalk
CR 765A Bridge replacement #010005 4 885 CST Bridge
Englewood Interstate connector 1 1 PE Road
Forrest Nelson from Quesada to Bachman 1 201 CST Sidewalk
Gulf Course from Fairway to Knollwood 2 50 CST Sidewalk
I-75 at Br #010059 & 010060 1 2458 CST Bridge
I-75 Full Deck Panel 1 2059 DSB Bridge
I-75 @ Peace River Br 1 1575 INC Road
I-75 from Lee CO/L to US 17 2 9767 CST Resurface
Jones Loop Rd at Piper Rd and I-75 S ramp 2 300 CST Signals
Murdock Area sidewalks 3 300 CST Sidewalks
Piper Rd Corridor from I-75/Jones Loop Rd to CR 74 3 500 CAP Road
Piper Rd Corridor Improvements Phase I 3 750 CAP Road
Piper Rd Corridor Improvements Phase II 4 500 CAP Road
Punta Gorda Traffic Signals Reimbursement 1 15 OPS Signals
SR 31 from Lee CO/L to CR 74 2 4631 CST Resurface
SR 31 from CR 74 to DeSoto CO/L 2 2394 CST Resurface
Toledo Blade from US 41 to Pellam 2 928 PDE Road
Toledo Blade from US 41 to Pellam 4 1518 PE Road
Trabue Harbor Walk Laishley to Phase I 1 225 CST Bike Path
Traffic Signals 1 32 OPS Signals
US 17 from CR 764 S to CR 764 N 3 377 CST Landscape
US 17 from CR 764 S to DeSoto CO/L 2 10385 ADM Road
US 17 NB (Olympia) from US 41 to Cochran 3 418 CST Drainage
US 17 NB (Olympia) from US 41 to Cooper 1 80 PE Resurface
US 41 from N of SR 776 to Sarasota CO/L 1 2883 CST Resurface
US 41 from Lee CO/L to S of Morningside 2 4053 CST Resurface
US 41 from S of Morningside to St Francis Rd 2 1515 CST Resurface
US 41 from Peace River to Bayshore 3 80 CST Sidewalk
US 41 from N of Peace River Br to SR 776 5 750 PDE Road
US 41 from Bayshore Rd to Tarpon Blvd 4 470 CST Sidewalk
US 41 North at Taylor 2 75 CST Landscape
US 41 South at Gilchrist Br 2 125 CST Landscape
US 41 S from Carmelita to Marion 5 400 CST Landscape
US 41 from Aqui Esta to Carmalita St 1 200 CST Landscape
US 41 from Carmalita to Peace River Br 2 200 CST Landscape
 

YEAR,  Refers to the year the project is at. i.e. (2nd year of a 3 year project)

ADM - Administration,  PDE - Project Development and Environment,  PE - Preliminary Engineering,  CST - Construction.

OPS - Operations Grant,  CAP - Capital Grant,  DSB - Design Build,  INC - Incentive